Application Case · conveyor wear parts

Mining Transfer Tower Wear Liner Retrofit

How a copper concentrator replaced 240 m² of steel chute liner with UHMWPE in one shutdown.

Discuss Your Project
Mining Transfer Tower Wear Liner Retrofit

Project Brief

A copper concentrator's primary transfer tower (between the SAG mill discharge belt and the secondary crushing screen) was running through Q235 mild-steel liner plates every 9 months. Each shutdown took 4 days and the liner replacement labour bill was higher than the steel itself.

Specification

Lead Time

22 days from drawing approval to FOB Qingdao. Customer cleared customs in Antofagasta in 9 days and installed during a planned 5-day SAG mill shutdown.

Result

3 years later, panels show ~12 mm of wear out of 30 mm — projected 7-year service life vs the 9-month steel replacement cycle. Labour saved alone paid for the UHMWPE liners within 14 months.

Why UHMWPE Over AR-400 Steel

UHMWPE is one-eighth the weight of steel — easier panel handling, faster installation, and no hot-work permits required on site. The slick surface also reduces choking and material build-up at the transfer point, improving mass-flow geometry.

Recommended Products for This Application

UHMWPE Transfer Chute & Hopper Liner Panels

UHMWPE Transfer Chute & Hopper Liner Panels

Pre-drilled UHMWPE wear panels for transfer chutes, hopper interiors, surge bins and truck beds.

View product →

Request a Quotation

Tell us about your conveyor wear parts project. Our engineering team responds within 12 hours with technical specs and FOB pricing.

Part of the JSLT Global Manufacturing Network · jslt-polymers.com jspolymers.com plasticos-ingenieria.com